{"id":71897,"date":"2020-01-09T20:40:09","date_gmt":"2020-01-10T01:40:09","guid":{"rendered":"https:\/\/www.exittechnlive.wpenginepowered.com\/?p=71897"},"modified":"2026-01-21T19:09:25","modified_gmt":"2026-01-21T19:09:25","slug":"plan-de-projet-de-migration-du-centre-de-donnees","status":"publish","type":"post","link":"https:\/\/exittechnologies.com\/fr\/blog\/centre-de-donnees\/plan-de-projet-de-migration-du-centre-de-donnees\/","title":{"rendered":"Migration des centres de donn\u00e9es : Le plan de projet ultime"},"content":{"rendered":"<span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Temps de lecture : <\/span> <span class=\"rt-time\"> 14<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span>\n<h2 class=\"wp-block-heading\" id=\"h-data-center-migration-project-plan\"><strong><span id=\"urn:local-annotation-398159\" class=\"textannotation disambiguated\">Plan de projet de migration du centre de donn\u00e9es<\/span><\/strong><\/h2>\n\n\n\n<h5 class=\"wp-block-heading\" id=\"h-so-you-are-looking-for-tips-on-data-center-migration-and-the-steps-it-takes-to-effectively-migrate-from-one-location-to-another-you-may-be-asking-yourself-how-important-is-thorough-planning-anyways\">Vous recherchez donc des conseils sur la migration des centres de donn\u00e9es et les \u00e9tapes n\u00e9cessaires pour migrer efficacement d'un site \u00e0 un autre. Vous vous demandez peut-\u00eatre \"Quelle est l'importance d'une planification minutieuse ?\"<\/h5>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-data-center-migration\">Qu'est-ce que la migration des centres de donn\u00e9es ?<\/h2>\n\n\n\n<p>La migration d'un centre de donn\u00e9es est le transfert de certains actifs d'un centre de donn\u00e9es \u00e0 un autre. Elle est \u00e9galement connue sous le nom de relocalisation de centre de donn\u00e9es.&nbsp;<\/p>\n\n\n\n<p>Vous vous demandez quel est le meilleur moment pour une <a href=\"https:\/\/exittechnologies.com\/fr\/services-de-centre-de-donnees\/migration\/\">services de migration des centres de donn\u00e9es<\/a>? Consultez nos offres de services et laissez-nous faire le gros du travail !<\/p>\n\n\n\n<p>Poursuivre la lecture pour la <a href=\"https:\/\/exittechnologies.com\/fr\/blog\/centre-de-donnees\/la-liste-de-controle-ultime-pour-la-relocalisation-des-centres-de-donnees-naviguer-avec-precision-dans-votre-demenagement\/\">liste de contr\u00f4le du plan de projet de migration du centre de donn\u00e9es<\/a>Les \u00e9tapes et le guide n\u00e9cessaires \u00e0 une migration r\u00e9ussie.<\/p>\n\n\n\n<p>Les raisons pour lesquelles une organisation peut avoir besoin de d\u00e9placer un centre de donn\u00e9es sont multiples : croissance de l'entreprise, fusion d'entreprises, exigences l\u00e9gales, ou simplement changement de bureaux ou passage \u00e0 l'informatique d\u00e9mat\u00e9rialis\u00e9e.<\/p>\n\n\n\n<p>Si vous demandez \u00e0 des entreprises comme <a href=\"https:\/\/www.americanis.net\/2014\/5-worst-disasters-data-center-history\/\" target=\"_blank\" rel=\"noopener\">Samsung et AT&amp;T qui ont perdu des milliards de dollars<\/a> \u00e0 la suite d'erreurs facilement \u00e9vitables dans les centres de donn\u00e9es, la r\u00e9ponse est \".<strong>tr\u00e8s.<\/strong>\"&nbsp;<\/p>\n\n\n\n<p>M\u00eame si tout va bien, de nombreux projets de centres de donn\u00e9es prennent du retard.<\/p>\n\n\n\n<div class=\"wp-block-group is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"h-we-re-your-one-point-of-contact-for-data-center-services\">Nous sommes votre point de contact unique pour les services de centre de donn\u00e9es<\/h2>\n\n\n\n<div class=\"wp-block-group is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button aligncenter\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/exittechnologies.com\/fr\/services-de-centre-de-donnees\/migration\/\">Contactez nos experts pour une solution adapt\u00e9e \u00e0 vos besoins<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<p>Apr\u00e8s tout, ce n'est pas une mince affaire que de d\u00e9placer <a href=\"https:\/\/www.networkworld.com\/article\/3408176\/the-titan-supercomputer-is-being-decommissioned-a-costly-time-consuming-project.html\" target=\"_blank\" rel=\"noopener\">350 tonnes de mat\u00e9riel<\/a>. Le projet Titan a n\u00e9cessit\u00e9 40 mois de travail, et ce uniquement pour le projet de d\u00e9mant\u00e8lement.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Heureusement, nous avons fait plusieurs fois le tour de la question pour vous aider \u00e0 \u00e9viter certains des probl\u00e8mes que nous avons rencontr\u00e9s. Dans cet article, nous aborderons le processus de d\u00e9couverte, de d\u00e9classement et de migration, les principes et les \u00e9tapes \u00e0 suivre lors de l'\u00e9laboration de votre plan de projet.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-the-data-center-big-picture\">L'image globale du centre de donn\u00e9es<\/h3>\n\n\n\n<p>Le fait est que chaque projet de centre de donn\u00e9es sera diff\u00e9rent et n\u00e9cessitera donc un plan diff\u00e9rent. Il se peut que vous deviez migrer la moiti\u00e9 des serveurs et mettre le reste hors service. Il se peut que vous ayez besoin de plusieurs sous-traitants pour g\u00e9rer l'ampleur du mat\u00e9riel. C'est pourquoi cet article ne tentera pas de vous fournir un plan de projet fourre-tout, mais vous proposera des questions directrices et un cadre g\u00e9n\u00e9ral pour l'\u00e9laboration de votre propre plan de projet de migration de centre de donn\u00e9es.&nbsp;<\/p>\n\n\n\n<p>En g\u00e9n\u00e9ral, il y a plusieurs phases :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lancement de projets au niveau de la direction<\/li>\n\n\n\n<li>D\u00e9couverte et \u00e9valuation du r\u00e9seau<\/li>\n\n\n\n<li>Planification de la d\u00e9composition des centres de donn\u00e9es<\/li>\n\n\n\n<li>Planification de la migration des centres de donn\u00e9es<\/li>\n\n\n\n<li>Plan directeur finalis\u00e9 et liste de contr\u00f4le du jour de la mise en \u0153uvre<\/li>\n<\/ul>\n\n\n\n<p>Nous passerons en revue chaque phase dans l'ordre et, \u00e0 la fin de l'article, nous fournirons un mod\u00e8le et un exemple de liste de contr\u00f4le pour votre plan de projet.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-executive-level-project-initiation\">Lancement de projets au niveau de la direction<\/h2>\n\n\n\n<p>Il est \u00e9vident que la d\u00e9cision de migrer un centre de donn\u00e9es doit venir d'en haut, au niveau des parties prenantes, avant d'\u00eatre transmise au gestionnaire de service ou de projet concern\u00e9.&nbsp;<\/p>\n\n\n\n<p>Tout le monde sait que l'adh\u00e9sion est essentielle, mais en termes d'\u00e9l\u00e9ments tangibles :<\/p>\n\n\n\n<p>L'un des probl\u00e8mes les plus fr\u00e9quents lors de la migration d'un centre de donn\u00e9es est le d\u00e9calage entre les attentes des parties prenantes et le d\u00e9roulement de la migration.&nbsp;<\/p>\n\n\n\n<p>Pour \u00e9viter cela, il peut \u00eatre tr\u00e8s utile d'obtenir d\u00e8s le d\u00e9part une estimation des co\u00fbts totaux et des calendriers par une tierce partie. En outre, le fait de discuter des points de tension communs pour g\u00e9rer les attentes peut contribuer \u00e0 \u00e9viter une situation perdante. La derni\u00e8re chose que l'on souhaite, c'est de lancer un projet gigantesque qui sera annul\u00e9 \u00e0 mi-parcours.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter\"><img decoding=\"async\" width=\"500\" height=\"357\" src=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Questions-before-migration-project.jpg\" alt=\"Questions \u00e0 poser avant de proc\u00e9der \u00e0 une migration de d\u00e9composition\" class=\"wp-image-71899\" srcset=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Questions-before-migration-project.jpg 500w, https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Questions-before-migration-project-300x214.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-questions-to-get-out-of-the-way\">Questions \u00e0 \u00e9carter<\/h3>\n\n\n\n<p>\u00c0 quel moment y aura-t-il r\u00e9ellement des produits \u00e0 livrer ? Que se passe-t-il si la migration est retard\u00e9e ? Les parties prenantes sont-elles inform\u00e9es des inconnues ?<\/p>\n\n\n\n<p>Une autre question concerne les ressources : certains experts ou membres critiques de l'\u00e9quipe sont-ils occup\u00e9s \u00e0 d'autres projets, ce qui ne laisse que des ressources humaines sous-optimales pour le projet ?&nbsp;<\/p>\n\n\n\n<p>Si vous migrez vers le nuage, quelles charges doivent \u00eatre maintenues dans votre propre centre d'h\u00e9bergement ? Ont-ils des fantasmes d\u00e9lirants \u00e0 propos d'un lift and shift parfait o\u00f9 chaque application fonctionne comme par magie exactement de la m\u00eame mani\u00e8re dans le nuage ? En savoir plus sur le <a href=\"https:\/\/exittechnologies.com\/fr\/blog\/informatique-en-nuage\/migration-des-centres-de-donnees-7-erreurs-courantes-de-migration-vers-le-cloud\/\">Les 7 probl\u00e8mes les plus courants li\u00e9s \u00e0 la migration vers l'informatique d\u00e9mat\u00e9rialis\u00e9e.<\/a><\/p>\n\n\n\n<p>Enfin, tous les d\u00e9cideurs comprennent-ils r\u00e9ellement ce qu'est ce projet ? Peu importe le plan du projet de migration lui-m\u00eame, mais l'objet du plan.<\/p>\n\n\n\n<p>La question peut para\u00eetre saugrenue, mais les d\u00e9cideurs non impliqu\u00e9s consid\u00e8rent souvent qu'une migration n'est qu'une simple t\u00e2che logistique s'il s'agit d'une migration \u00e0 grande \u00e9chelle.<\/p>\n\n\n\n<p>Ils peuvent \u00e9galement ne pas comprendre comment la migration se traduit par une meilleure exp\u00e9rience pour l'utilisateur final.&nbsp;<\/p>\n\n\n\n<p>Par exemple, l'automatisation de la mise en place de l'infrastructure et de l'approvisionnement des serveurs peut garantir que les utilisateurs finaux ne sont pas perturb\u00e9s, et ce sans qu'aucune personne ne touche quoi que ce soit.<\/p>\n\n\n\n<p>Le fait de travailler sur ces points de contr\u00f4le des t\u00e2ches peut aider \u00e0 \u00e9viter qu'un d\u00e9cideur n'annule l'ensemble du projet lorsque les choses deviennent difficiles, ce qui ferait perdre du temps \u00e0 tout le monde.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-data-center-migration-common-challenges\">Migration des centres de donn\u00e9es - D\u00e9fis communs<\/h2>\n\n\n\n<p>La migration d'un centre de donn\u00e9es pr\u00e9sente un certain nombre de d\u00e9fis. Le volume d'\u00e9l\u00e9ments \u00e0 auditer et \u00e0 documenter au cours de la migration est stup\u00e9fiant. En outre, la migration d'un centre de donn\u00e9es peut acc\u00e9l\u00e9rer le rythme des changements au sein d'une organisation.<\/p>\n\n\n\n<p>La plupart des probl\u00e8mes au sein d'une organisation sont caus\u00e9s par un changement quelconque, et une migration de centre de donn\u00e9es peut donc entra\u00eener une demande accrue de cartographie et de gestion du changement pour l'organisation. En raison de la pr\u00e9sence de nombreuses \u00e9quipes diff\u00e9rentes dont les membres se d\u00e9placent rapidement, la communication peut \u00eatre irr\u00e9guli\u00e8re.<\/p>\n\n\n\n<p>Les conditions sont id\u00e9ales lorsque les personnes sur le terrain, la direction et les cadres sont en mesure de collaborer \u00e9troitement, mais les organisations ont souvent du mal \u00e0 faciliter cette collaboration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-data-center-migration-steps-for-a-successful-migration\">Migration des centres de donn\u00e9es : les \u00e9tapes d'une migration r\u00e9ussie<\/h2>\n\n\n\n<p>Vous trouverez ci-dessous les \u00e9tapes de la migration du centre de donn\u00e9es que votre entreprise doit prendre en compte pour une migration r\u00e9ussie.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-create-a-plan\">Cr\u00e9er un plan<\/h3>\n\n\n\n<p>Un plan doit comprendre&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Un calendrier pr\u00e9liminaire<\/li>\n\n\n\n<li>Un plan de communication<\/li>\n\n\n\n<li>R\u00f4les et responsabilit\u00e9s<\/li>\n\n\n\n<li>Buts et objectifs<\/li>\n\n\n\n<li>ICP<\/li>\n\n\n\n<li>Estimation du budget<\/li>\n\n\n\n<li>Projets de d\u00e9m\u00e9nagement<\/li>\n\n\n\n<li>Impr\u00e9vus, reprise apr\u00e8s sinistre<\/li>\n\n\n\n<li>D\u00e9couverte et validation des actifs<\/li>\n\n\n\n<li>Questions de conformit\u00e9 et de r\u00e9glementation<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-identify-scope-time-and-cost\">D\u00e9terminer le champ d'application, le d\u00e9lai et le co\u00fbt<\/h3>\n\n\n\n<p>En fonction du volume des applications et des charges de travail, de la configuration des syst\u00e8mes, du personnel et de l'exp\u00e9rience, une migration typique d'un centre de donn\u00e9es vers l'informatique d\u00e9mat\u00e9rialis\u00e9e peut prendre de quelques semaines \u00e0 quelques mois dans les cas les plus extr\u00eames.<\/p>\n\n\n\n<p>Toutefois, le d\u00e9lai habituel est plus proche de 1 ou 2 mois. Une estimation approximative des co\u00fbts pour une relocalisation physique peut \u00eatre de l'ordre de $5,000-$20,000 par rack. Les co\u00fbts d'une migration de physique \u00e0 virtuel ne sont pas aussi importants.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-determine-resource-requirements\">D\u00e9terminer les besoins en ressources<\/h3>\n\n\n\n<p>La plupart des organisations ne disposent pas des ressources humaines internes n\u00e9cessaires pour effectuer une migration optimale du centre de donn\u00e9es. En outre, le personnel informatique peut d\u00e9j\u00e0 \u00eatre tr\u00e8s dispers\u00e9. C'est particuli\u00e8rement vrai pour les employ\u00e9s de l'InfoSec.<\/p>\n\n\n\n<p>Il est donc presque toujours n\u00e9cessaire de faire appel \u00e0 une soci\u00e9t\u00e9 de migration pour obtenir des conseils. Dans certains cas, un employ\u00e9 interne exp\u00e9riment\u00e9 peut faire office de gestionnaire de projet comp\u00e9tent, mais ce r\u00f4le est souvent externalis\u00e9.<\/p>\n\n\n\n<p>Une fois que la logistique, les op\u00e9rations, le soutien, la conformit\u00e9 et d'autres \u00e9tapes sont d\u00e9finies, il peut \u00eatre plus facile d'identifier les t\u00e2ches qui devront \u00eatre renforc\u00e9es par des ressources ext\u00e9rieures.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-build-a-data-center-migration-checklist\">\u00c9laborer une liste de contr\u00f4le pour la migration des centres de donn\u00e9es<\/h3>\n\n\n\n<p>Une liste de r\u00e9f\u00e9rence utile peut \u00eatre consult\u00e9e \u00e0 l'adresse suivante <a href=\"https:\/\/www.sunbirddcim.com\/sites\/default\/files\/Job_Aid_Data_Center_Migration_Checklist.pdf\" target=\"_blank\" rel=\"noopener\">sunbirddcim<\/a>. A <a href=\"https:\/\/www.davidkennethgroup.com\/business-iq\/resources\/migration-strategy-board\" target=\"_blank\" rel=\"noopener\">Feuille de route utile pour la migration<\/a> peuvent \u00e9galement \u00eatre consult\u00e9s \u00e0 partir du groupe David Kenneth.<\/p>\n\n\n\n<p>La cr\u00e9ation d'une liste de contr\u00f4le pour la migration des centres de donn\u00e9es est sp\u00e9cifique \u00e0 votre organisation, il peut donc \u00eatre utile de consulter diverses autres ressources pour avoir une meilleure id\u00e9e de ce que serait la meilleure liste de contr\u00f4le pour la migration des centres de donn\u00e9es pour votre organisation.<\/p>\n\n\n\n<p>L'utilisation d'une liste de contr\u00f4le pour la migration des centres de donn\u00e9es peut vous aider \u00e0 g\u00e9rer les t\u00e2ches critiques et \u00e0 r\u00e9duire les temps d'arr\u00eat et les risques pendant la migration. Le respect de cette liste de contr\u00f4le peut contribuer \u00e0 la r\u00e9ussite de la transition avant, pendant et apr\u00e8s la migration.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-migration-project-planning\">Planification du projet de migration<\/h4>\n\n\n\n<p>Lorsque vous commencez \u00e0 planifier, la premi\u00e8re chose \u00e0 faire sur votre liste de contr\u00f4le pour la migration des donn\u00e9es est d'identifier et d'impliquer toutes les fonctions organisationnelles et les parties prenantes qui seront affect\u00e9es par la migration.&nbsp;<\/p>\n\n\n\n<p>Il est pr\u00e9f\u00e9rable de d\u00e9signer un responsable de la migration capable de travailler avec plusieurs fonctions, de faciliter la migration et de communiquer efficacement pour assurer la r\u00e9ussite du projet.<\/p>\n\n\n\n<p>Le responsable de la migration doit pr\u00e9senter aux parties prenantes le plan de migration, qui doit comprendre un budget, un calendrier et des crit\u00e8res de r\u00e9ussite, afin d'obtenir leur adh\u00e9sion. Il doit ensuite \u00e9laborer un plan de communication pour tenir toutes les parties prenantes inform\u00e9es de l'avancement du projet.<\/p>\n\n\n\n<p>C'est \u00e9galement \u00e0 ce stade que l'\u00e9quipe doit s'aligner sur les r\u00f4les et les responsabilit\u00e9s pour le projet. Il convient \u00e9galement d'examiner les contrats et les accords de niveau de service pertinents afin de d\u00e9terminer les conditions qui pourraient avoir une incidence sur le budget ou le calendrier. Avant de passer \u00e0 l'\u00e9tape suivante, rassemblez tous les documents dont vous pourriez avoir besoin pendant la migration et conservez-les dans un endroit central.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-asset-and-application-inventory\">Inventaire des actifs et des applications<\/h4>\n\n\n\n<p>Vous devrez dresser un inventaire du mat\u00e9riel et des autres \u00e9quipements pour d\u00e9terminer ce qui doit \u00eatre migr\u00e9 et qui en est propri\u00e9taire.&nbsp;<\/p>\n\n\n\n<p>Vous devrez faire l'inventaire de la connectivit\u00e9 et des applications du r\u00e9seau et dresser une liste du mat\u00e9riel, du c\u00e2blage ou des applications qui doivent \u00eatre cat\u00e9goris\u00e9s en vue de leur d\u00e9m\u00e9nagement ou de leur mise hors service.&nbsp;<\/p>\n\n\n\n<p>Cr\u00e9ez et mettez en \u0153uvre un syst\u00e8me qui vous permettra d'identifier facilement chaque \u00e9l\u00e9ment et chaque action.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-new-infrastructure-planning\">Planification des nouvelles infrastructures<\/h4>\n\n\n\n<p>La partie suivante de votre liste de contr\u00f4le pour la migration des donn\u00e9es doit concerner la planification de votre nouvelle infrastructure. Cr\u00e9ez un plan virtuel de l'emplacement de chaque \u00e9l\u00e9ment et de la mani\u00e8re dont il sera connect\u00e9. Incluez la conception du r\u00e9seau et dressez une liste du c\u00e2blage et des sources d'alimentation dont vous aurez besoin.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-pre-migration\">Pr\u00e9-migration<\/h4>\n\n\n\n<p>Votre liste de contr\u00f4le devrait inclure une planification du jour J avec des \u00e9ch\u00e9ances, une description des r\u00f4les et les coordonn\u00e9es des membres de l'\u00e9quipe de migration. Si possible, planifiez votre migration en plusieurs phases afin de limiter l'impact sur les ressources et les applications critiques. Vous aurez peut-\u00eatre besoin d'un service de migration. Si c'est le cas, c'est le moment de le planifier.<\/p>\n\n\n\n<p>Faites une visite de votre nouvel espace pour vous assurer qu'il n'y a pas d'obstacles \u00e0 l'installation et fournissez des instructions d\u00e9taill\u00e9es sur l'emplacement de tous les \u00e9quipements et la mani\u00e8re dont ils doivent \u00eatre install\u00e9s.<\/p>\n\n\n\n<p>Documentez toutes les nouvelles configurations et cr\u00e9ez des plans de test pour vous assurer que tous les \u00e9quipements et applications seront op\u00e9rationnels. Il est essentiel de cr\u00e9er un plan de reprise apr\u00e8s sinistre et un plan d'urgence en cas de d\u00e9faillance du mat\u00e9riel ou de temps d'arr\u00eat prolong\u00e9. Enfin, proc\u00e9dez \u00e0 une simulation du processus de migration.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-migration-day\">Journ\u00e9e de la migration<\/h4>\n\n\n\n<p>Le jour de la migration de votre centre de donn\u00e9es, assurez-vous que votre plan de d\u00e9m\u00e9nagement et tous vos ordres de travail sont en place pour chaque bien \u00e0 d\u00e9placer. Apr\u00e8s le d\u00e9m\u00e9nagement, confirmez que le mat\u00e9riel et l'\u00e9quipement ont \u00e9t\u00e9 livr\u00e9s comme pr\u00e9vu et assurez-vous que votre personnel commence l'installation.&nbsp;<\/p>\n\n\n\n<p>Veillez \u00e0 \u00e9valuer fr\u00e9quemment les progr\u00e8s accomplis pour vous assurer que la migration est achev\u00e9e dans les d\u00e9lais et communiquez les mises \u00e0 jour aux parties prenantes.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-post-migration\">Post-migration<\/h4>\n\n\n\n<p>Effectuer tous les tests de syst\u00e8me prescrits par le plan de d\u00e9placement du responsable de la migration afin de s'assurer que tous les appareils et applications ont \u00e9t\u00e9 migr\u00e9s avec succ\u00e8s. V\u00e9rifier aupr\u00e8s du centre d'exploitation du r\u00e9seau que l'\u00e9quipe est bien inform\u00e9e de la remise en service des syst\u00e8mes et des donn\u00e9es d'alimentation. Il est conseill\u00e9 de proc\u00e9der \u00e0 un audit ponctuel de certains \u00e9quipements pour s'assurer qu'ils sont install\u00e9s et connect\u00e9s conform\u00e9ment \u00e0 la documentation. Pour finir, <a href=\"https:\/\/exittechnologies.com\/fr\/services-de-centre-de-donnees\/data-center-decommissioning-services\/\">mettre hors service et \u00e9liminer les anciens \u00e9quipements <\/a>et le c\u00e2blage si n\u00e9cessaire.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-planning-data-and-application-migration\">Planification de la migration des donn\u00e9es et des applications<\/h3>\n\n\n\n<p>La migration des donn\u00e9es se fait en trois \u00e9tapes :&nbsp;<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Extraire les donn\u00e9es<\/li>\n\n\n\n<li>Transformer les donn\u00e9es<\/li>\n\n\n\n<li>Charger les donn\u00e9es<\/li>\n<\/ol>\n\n\n\n<p>Au fur et \u00e0 mesure que les donn\u00e9es se d\u00e9veloppent, elles attirent d'autres donn\u00e9es et deviennent de plus en plus sp\u00e9cialis\u00e9es dans votre environnement. Il est donc utile de d\u00e9m\u00ealer les donn\u00e9es, un peu comme un ensemble de c\u00e2bles attach\u00e9s. Chaque type de migration de donn\u00e9es fait l'objet de consid\u00e9rations diff\u00e9rentes.<\/p>\n\n\n\n<p>Certaines migrations de donn\u00e9es ne consistent qu'\u00e0 d\u00e9placer des donn\u00e9es entre des baies, tandis que d'autres impliquent que les applications changent d'environnement. De nombreux principes s'appliquent aux migrations de donn\u00e9es et d'applications, tout comme les informations susmentionn\u00e9es sur la migration des centres de donn\u00e9es, \u00e9tant donn\u00e9 que la migration des donn\u00e9es est elle-m\u00eame une \u00e9tape dans les migrations des centres de donn\u00e9es.<\/p>\n\n\n\n<p>Data Migration Pro dispose d'une <a href=\"https:\/\/www.datamigrationpro.com\/data-migration-checklist-planner\/\" target=\"_blank\" rel=\"noopener\">liste de contr\u00f4le utile pour la migration des donn\u00e9es<\/a>. NextPathway propose \u00e9galement une <a href=\"https:\/\/blog.nextpathway.com\/a-complete-data-migration-checklist-for-enterprises\" target=\"_blank\" rel=\"noopener\">article sur la migration des donn\u00e9es, \u00e9tape par \u00e9tape<\/a>.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-planning-hardware-migration\">Planification de la migration du mat\u00e9riel<\/h3>\n\n\n\n<p>Lors du d\u00e9placement du mat\u00e9riel lui-m\u00eame, il est important de prendre de petites mesures pr\u00e9ventives, telles que l'utilisation de protections contre les pointes.<\/p>\n\n\n\n<p>Une option que nous ne recommandons pas est de faire appel \u00e0 des professionnels ou \u00e0 des entrepreneurs qui n'ont pas d'exp\u00e9rience en mati\u00e8re de d\u00e9placement de mat\u00e9riel de centre de donn\u00e9es.<\/p>\n\n\n\n<p>Les composants peuvent \u00eatre facilement endommag\u00e9s pendant le transport s'ils ne sont pas fix\u00e9s correctement, et les d\u00e9charges d'\u00e9lectricit\u00e9 statique peuvent parfois endommager les circuits.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-verify-target-data-center\">V\u00e9rifier le centre de donn\u00e9es cible<\/h3>\n\n\n\n<p>Les environnements des centres de donn\u00e9es varient consid\u00e9rablement. C'est pourquoi il convient de tenir compte de certains \u00e9l\u00e9ments pour s'assurer que le nouvel emplacement n'entra\u00eene pas de probl\u00e8mes.<\/p>\n\n\n\n<p>Une \u00e9valuation des co\u00fbts de l'\u00e9nergie et des conditions locales telles que les \u00e9tendues d'eau, l'humidit\u00e9 et la temp\u00e9rature peut avoir des effets significatifs sur les d\u00e9penses d'exploitation courantes.<\/p>\n\n\n\n<p>Une autre \u00e9tape critique est l'\u00e9valuation de l'infrastructure n\u00e9cessaire ou de l'infrastructure existante du centre de donn\u00e9es\/de l'emplacement. Votre fournisseur peut vous apporter une aide pr\u00e9cieuse dans le processus de s\u00e9lection et de v\u00e9rification du site cible.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-pre-production-tests\">Tests de pr\u00e9-production<\/h3>\n\n\n\n<p>Au cours de cette \u00e9tape, le r\u00e9seau, l'approvisionnement du serveur, les performances de l'application, etc. seront test\u00e9s dans la phase d'essai afin d'ajouter une autre couche de validation.<\/p>\n\n\n\n<p>Deux des meilleures ressources \u00e0 consulter sont <a href=\"https:\/\/www.gsa.gov\/cdnstatic\/DCOI%20Guides.pdf\" target=\"_blank\" rel=\"noopener\">Guide de migration DCOI de la GSA<\/a> et de l'aide aux tests de logiciels <a href=\"https:\/\/www.softwaretestinghelp.com\/data-migration-testing\/\" target=\"_blank\" rel=\"noopener\">article sur les tests de migration des donn\u00e9es<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-post-migration-testing\">Tests post-migration<\/h3>\n\n\n\n<p>Lors des tests post-migration, il est n\u00e9cessaire d'identifier les redondances, la s\u00e9curit\u00e9 de la base de donn\u00e9es, l'int\u00e9grit\u00e9 de la valeur, le format, le sch\u00e9ma, etc., ainsi que les tests de charge\/stress et la fonctionnalit\u00e9 de l'environnement pour l'utilisation du back-end et du front-end.<\/p>\n\n\n\n<p>L'article sur les tests de migration des donn\u00e9es ci-dessus contient \u00e9galement des informations tr\u00e8s utiles sur cette \u00e9tape.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter\"><img decoding=\"async\" width=\"500\" height=\"334\" src=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Migration-disaster.jpg\" alt=\"D\u00e9sastre lors de la migration du centre de donn\u00e9es\" class=\"wp-image-71900\" srcset=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Migration-disaster.jpg 500w, https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Migration-disaster-300x200.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-discovery-to-avoid-disaster\">La d\u00e9couverte pour \u00e9viter la catastrophe<\/h2>\n\n\n\n<p>Un aspect important de la planification de la migration est de savoir ce que vous migrez r\u00e9ellement en premier lieu.&nbsp;<\/p>\n\n\n\n<p>\u00c9tonnamment, il s'agit d'un probl\u00e8me tr\u00e8s courant. Il s'av\u00e8re que le suivi de milliers de serveurs peut s'av\u00e9rer d\u00e9licat.&nbsp;<\/p>\n\n\n\n<p>Selon que votre r\u00e9seau est plus plat ou plus virtualis\u00e9, le syst\u00e8me de gestion de l'information de l'entreprise est diff\u00e9rent.<a href=\"https:\/\/www.comparitech.com\/net-admin\/best-network-discovery-tools-and-software\/\" target=\"_blank\" rel=\"noopener\"> choix de l'outil de d\u00e9couverte <\/a>peut faire une grande diff\u00e9rence.&nbsp;<\/p>\n\n\n\n<p>Vous devrez \u00e9galement proc\u00e9der \u00e0 un audit physique des lieux. Il est \u00e9tonnant de voir ce que l'on peut trouver en faisant le tour du b\u00e2timent.&nbsp;<\/p>\n\n\n\n<p>Une fois que l'inventaire et les applications ont \u00e9t\u00e9 largement cartographi\u00e9s, vous pouvez commencer \u00e0 planifier les aspects techniques des applications qui seront transf\u00e9r\u00e9es dans le nuage et la mani\u00e8re dont elles le seront.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter\"><img decoding=\"async\" width=\"500\" height=\"334\" src=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Decom-project-plan.jpg\" alt=\"Plan du projet de d\u00e9mant\u00e8lement du centre de donn\u00e9es illustr\u00e9\" class=\"wp-image-71901\" srcset=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Decom-project-plan.jpg 500w, https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/Decom-project-plan-300x200.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-data-center-decommissioning-reasons-a-checklist-is-helpful\">Mise hors service d'un centre de donn\u00e9es - Raisons pour lesquelles une liste de contr\u00f4le est utile<\/h2>\n\n\n\n<p>Alors que la <a href=\"https:\/\/exittechnologies.com\/fr\/services-de-centre-de-donnees\/data-center-decommissioning-services\/\">d\u00e9mant\u00e8lement d'un centre de donn\u00e9es<\/a> n'est pas la partie la plus d\u00e9licate de la migration, mais ce n'est tout de m\u00eame pas une plaisanterie.\u00a0<\/p>\n\n\n\n<p>Des sp\u00e9cialistes de l'\u00e9lectricit\u00e9 pour mettre hors service la gigantesque infrastructure \u00e9lectrique.&nbsp;<\/p>\n\n\n\n<p><a href=\"https:\/\/exittechnologies.com\/fr\/services-de-centre-de-donnees\/itad\/\">Services ITAD<\/a> pour racheter et recycler les biens de valeur et les biens non pr\u00e9cieux, en plus de restituer les \u00e9quipements lou\u00e9s dans les d\u00e9lais pr\u00e9vus par le contrat. Vous pouvez \u00e9galement faire appel \u00e0 des sous-traitants pour d\u00e9monter et enlever les infrastructures lourdes telles que les syst\u00e8mes de chauffage, de ventilation et de climatisation, les refroidisseurs et les groupes \u00e9lectrog\u00e8nes.&nbsp;<\/p>\n\n\n\n<p>Pour obtenir une liste de contr\u00f4le compl\u00e8te \u00e0 suivre pour l'\u00e9tape de d\u00e9classement de la migration, vous pouvez <a href=\"https:\/\/exittechnologies.com\/fr\/ressources\/listes-de-controle-pour-le-declassement-des-centres-de-donnees\/\">t\u00e9l\u00e9charger ici<\/a>.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-data-center-migration-project-plan-nbsp\">Plan de projet de migration du centre de donn\u00e9es&nbsp;<\/h2>\n\n\n\n<p>Passons maintenant \u00e0 l'essentiel, \u00e0 savoir la planification de votre projet de migration vers un centre de donn\u00e9es.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Pour commencer, vous devez vous assurer que toutes les parties concern\u00e9es disposent des coordonn\u00e9es de toutes les autres parties concern\u00e9es.&nbsp;<\/p>\n\n\n\n<p>Ensuite, une bonne partie des jours est r\u00e9serv\u00e9e exclusivement \u00e0 la r\u00e9union de l'\u00e9quipe pour planifier le projet.&nbsp;<\/p>\n\n\n\n<p>La premi\u00e8re phase de la planification de la migration doit comporter les \u00e9l\u00e9ments suivants :<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Besoins en mati\u00e8re d'immobilier, d'alimentation et de refroidissement des centres de donn\u00e9es<\/li>\n\n\n\n<li>Sauvegardes du syst\u00e8me&nbsp;<\/li>\n\n\n\n<li>Sc\u00e9narios de reprise apr\u00e8s sinistre<\/li>\n\n\n\n<li>Ressources humaines n\u00e9cessaires<\/li>\n\n\n\n<li>Couverture d'assurance<\/li>\n\n\n\n<li>Besoins d'acc\u00e8s au site pour le personnel<\/li>\n\n\n\n<li>Besoins en mati\u00e8re d'acc\u00e8s \u00e0 distance<\/li>\n\n\n\n<li>Pi\u00e8ces de rechange en cas de dysfonctionnement de l'\u00e9quipement<\/li>\n\n\n\n<li>Fournisseur de la logistique du mat\u00e9riel informatique et point de contact interne<\/li>\n\n\n\n<li><a href=\"https:\/\/exittechnologies.com\/fr\/services-de-centre-de-donnees\/recyclage-electronique\/\">Recyclage<\/a> ou des services ITAD pour le mat\u00e9riel non utilis\u00e9<\/li>\n\n\n\n<li>Accords de niveau de service et contrats de location de mat\u00e9riel : dates, conditions<\/li>\n<\/ol>\n\n\n\n<p>Une fois que tout cela est fait, vous aurez peut-\u00eatre besoin d'un mois pour revenir en arri\u00e8re et planifier les conditions pr\u00e9alables \u00e0 la migration :<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Une date a-t-elle \u00e9t\u00e9 fix\u00e9e pour le d\u00e9m\u00e9nagement du mat\u00e9riel par le fournisseur de services logistiques ?<\/li>\n\n\n\n<li>La cha\u00eene de contr\u00f4le, l'effacement des donn\u00e9es et le recyclage responsable sont-ils \u00e9tablis pour les biens mis au rebut ?<\/li>\n\n\n\n<li>Toutes les licences n\u00e9cessaires sont-elles disponibles ?<\/li>\n\n\n\n<li>Les pi\u00e8ces de rechange ont-elles \u00e9t\u00e9 re\u00e7ues sur le nouveau site ?<\/li>\n\n\n\n<li>La connectivit\u00e9 a-t-elle \u00e9t\u00e9 test\u00e9e au niveau du c\u00e2blage et des panneaux de connexion ?<\/li>\n\n\n\n<li>Tous les administrateurs de syst\u00e8me disposent-ils des informations n\u00e9cessaires sur le r\u00e9seau ?<\/li>\n\n\n\n<li>Comment l'\u00e9quipement sera-t-il d\u00e9plac\u00e9 du quai d'exp\u00e9dition au quai de r\u00e9ception ?&nbsp;<\/li>\n\n\n\n<li>Quel est le mat\u00e9riel de d\u00e9m\u00e9nagement disponible sur le nouveau site ?<\/li>\n\n\n\n<li>Dans quel ordre le mat\u00e9riel doit-il \u00eatre d\u00e9plac\u00e9 ?<\/li>\n\n\n\n<li>Qui installera les baies, le c\u00e2blage et mettra en place l'infrastructure ?<\/li>\n\n\n\n<li>Le jour du d\u00e9m\u00e9nagement a-t-il fait l'objet d'une simulation ?&nbsp;<\/li>\n\n\n\n<li>Quel administrateur v\u00e9rifiera la configuration des ports pour s'assurer de l'\u00e9quivalence entre l'ancien et le nouveau site ?<\/li>\n\n\n\n<li>Qui s'occupera de l'\u00e9quipement, et dans quel ordre ?<\/li>\n\n\n\n<li>Quels sont les membres de l'\u00e9quipe, les consultants, les fournisseurs et les superviseurs qui doivent examiner le plan de projet finalis\u00e9 ?<\/li>\n<\/ol>\n\n\n\n<p>En savoir plus <a href=\"https:\/\/exittechnologies.com\/fr\/blog\/centre-de-donnees\/creer-un-plan-de-migration-du-centre-de-donnees-reussir-la-migration\/\" target=\"_blank\" rel=\"noreferrer noopener\">Comment cr\u00e9er un plan de migration des donn\u00e9es r\u00e9ussi<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter\"><img decoding=\"async\" width=\"500\" height=\"334\" src=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/finalized-data-center-migration.jpg\" alt=\"plan de projet de migration termin\u00e9\" class=\"wp-image-71902\" srcset=\"https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/finalized-data-center-migration.jpg 500w, https:\/\/exittechnologies.com\/wp-content\/uploads\/2020\/01\/finalized-data-center-migration-300x200.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<div style=\"height:26px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-finalized-master-plan-and-implementation\">Plan directeur finalis\u00e9 et mise en \u0153uvre<\/h2>\n\n\n\n<p>Une fois que vous avez discut\u00e9 et mis au point les calendriers pour les points susmentionn\u00e9s, un plan pour le jour J est inestimable.<\/p>\n\n\n\n<p>\u00c0 ce stade, il est normal de disposer d'une liste d'actions pr\u00e9d\u00e9termin\u00e9es et\/ou d'une liste d'escalade pour tout probl\u00e8me pr\u00e9visible. En cas de probl\u00e8me, qui informera les utilisateurs finaux et avec quel message ?&nbsp;<\/p>\n\n\n\n<p>Tout le monde est-il pr\u00e9sent et en ligne ? Toutes les sauvegardes sont-elles valides et test\u00e9es ?&nbsp;<\/p>\n\n\n\n<p>Chaque objectif a-t-il \u00e9t\u00e9 assign\u00e9 \u00e0 des membres sp\u00e9cifiques de l'\u00e9quipe avec des estimations de temps ?&nbsp;<\/p>\n\n\n\n<p>Une simulation de catastrophe a-t-elle \u00e9t\u00e9 effectu\u00e9e ?&nbsp;<\/p>\n\n\n\n<p>Une fois que le plan de migration de votre centre de donn\u00e9es a \u00e9t\u00e9 formalis\u00e9, il ne serait pas inutile de demander \u00e0 un autre consultant en migration d'y jeter un coup d'\u0153il pour s'assurer que rien n'a \u00e9t\u00e9 oubli\u00e9.<\/p>\n\n\n\n<p>Pour une vue d'ensemble :<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-data-center-migration-best-practices\">Meilleures pratiques en mati\u00e8re de migration des centres de donn\u00e9es<\/h2>\n\n\n\n<p>Outre le contenu de cet article, il existe de nombreuses \"meilleures pratiques en mati\u00e8re de migration des centres de donn\u00e9es\" qui sont souvent discut\u00e9es et qui rel\u00e8vent franchement du bon sens. Toutefois, d'autres pratiques souvent n\u00e9glig\u00e9es m\u00e9ritent d'\u00eatre abord\u00e9es dans une note de bas de page. Il s'agit de choses qu'il est facile de n\u00e9gliger. Par exemple, la phase de documentation est essentielle, mais une documentation excessive peut entra\u00eener un d\u00e9passement du budget et du calendrier \u00e9tabli. Si les serveurs, l'infrastructure, les services en nuage existants et les applications ont d\u00e9j\u00e0 \u00e9t\u00e9 cartographi\u00e9s assez rigoureusement et r\u00e9cemment, un outil d'autod\u00e9couverte de qualit\u00e9 suivi d'audits physiques et de donn\u00e9es doublement v\u00e9rifi\u00e9s suffira. Ne pas pr\u00e9parer correctement le site cible en ce qui concerne les circuits, l'alimentation \u00e9lectrique, le refroidissement, etc. est une autre bonne pratique qu'il est facile d'oublier. Enfin, il est absolument essentiel de s'assurer que toutes les parties disposent des bonnes coordonn\u00e9es des membres de l'\u00e9quipe concern\u00e9s en cas d'urgence.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>\u00c9valuation des risques et strat\u00e9gies d'att\u00e9nuation<\/strong><\/h2>\n\n\n\n<p>Avant de lancer la migration d'un centre de donn\u00e9es, il est essentiel de proc\u00e9der \u00e0 une \u00e9valuation d\u00e9taill\u00e9e des risques. Cette \u00e9valuation permet d'identifier <a href=\"https:\/\/exittechnologies.com\/fr\/blog\/centre-de-donnees\/reprise-rationalisee-et-efficace-dun-centre-de-donnees-pour-une-entreprise-roumaine\/\">les d\u00e9fis potentiels li\u00e9s \u00e0 la migration des centres de donn\u00e9es<\/a> tels que la perte de donn\u00e9es, les temps d'arr\u00eat prolong\u00e9s, les failles de s\u00e9curit\u00e9 et la non-conformit\u00e9 aux r\u00e9glementations sectorielles. Comprendre ces risques d\u00e8s le d\u00e9but permet de d\u00e9velopper une strat\u00e9gie solide pour minimiser leur impact.<\/p>\n\n\n\n<p><strong>Perte de donn\u00e9es :<\/strong> Mettre en \u0153uvre des plans de sauvegarde et de r\u00e9cup\u00e9ration complets. Tester r\u00e9guli\u00e8rement ces sauvegardes pour s'assurer que les donn\u00e9es peuvent \u00eatre restaur\u00e9es efficacement.<\/p>\n\n\n\n<p><strong>Temps d'arr\u00eat :<\/strong> Planifier les migrations pendant les heures creuses et utiliser des approches progressives pour minimiser les perturbations op\u00e9rationnelles. Veiller \u00e0 ce qu'il y ait des plans d'urgence en cas de probl\u00e8mes inattendus.<\/p>\n\n\n\n<p><strong>Violations de la s\u00e9curit\u00e9 : <\/strong>Mener des audits de s\u00e9curit\u00e9 approfondis avant et apr\u00e8s la migration. Renforcer les protocoles de s\u00e9curit\u00e9 et veiller \u00e0 ce que toutes les donn\u00e9es soient crypt\u00e9es pendant le transfert.<\/p>\n\n\n\n<p><strong>Conformit\u00e9 r\u00e9glementaire : <\/strong>Examiner toutes les r\u00e9glementations pertinentes pour garantir la conformit\u00e9. Cela peut impliquer la r\u00e9alisation d'audits de donn\u00e9es, le renforcement des mesures de s\u00e9curit\u00e9 et, \u00e9ventuellement, la consultation d'experts juridiques en mati\u00e8re de confidentialit\u00e9 des donn\u00e9es.<\/p>\n\n\n\n<p>L'att\u00e9nuation de ces risques n\u00e9cessite une planification et une ex\u00e9cution m\u00e9ticuleuses. En anticipant les probl\u00e8mes potentiels et en \u00e9laborant des strat\u00e9gies pour les r\u00e9soudre, les entreprises peuvent garantir un plan et un processus de migration des centres de donn\u00e9es plus fluides et plus s\u00fbrs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>S\u00e9lection et gestion des fournisseurs<\/strong><\/h2>\n\n\n\n<p>La r\u00e9ussite d'une migration de centre de donn\u00e9es repose en grande partie sur la s\u00e9lection des bons fournisseurs, ce qui n\u00e9cessite d'\u00e9valuer les partenaires potentiels en fonction de leur exp\u00e9rience, de leur expertise technique des outils de migration de centre de donn\u00e9es, de leur fiabilit\u00e9 et de leur rapport co\u00fbt-efficacit\u00e9. Il est \u00e9galement important de prendre en compte leurs offres d'assistance apr\u00e8s la migration.&nbsp;<\/p>\n\n\n\n<p>Une fois les fournisseurs s\u00e9lectionn\u00e9s, une gestion efficace est essentielle \u00e0 la r\u00e9ussite du projet. Il s'agit notamment d'\u00e9tablir des canaux de communication clairs pour des mises \u00e0 jour et des r\u00e9unions r\u00e9guli\u00e8res, de d\u00e9finir les r\u00f4les et les responsabilit\u00e9s afin d'\u00e9viter les chevauchements ou les lacunes dans les services, et de mettre en place des indicateurs de performance cl\u00e9s pour contr\u00f4ler les performances des fournisseurs. Des examens r\u00e9guliers de ces indicateurs permettent de s'assurer que les fournisseurs respectent leurs engagements et de proc\u00e9der aux ajustements n\u00e9cessaires. Une relation solide et collaborative avec les fournisseurs, fond\u00e9e sur la confiance et le respect mutuel, peut consid\u00e9rablement am\u00e9liorer l'efficacit\u00e9 et l'efficience du processus de migration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Gestion du changement et communication<\/strong><\/h2>\n\n\n\n<p>La gestion de l'aspect humain d'une migration de centre de donn\u00e9es est aussi importante que les d\u00e9fis techniques. Une gestion du changement et une communication efficaces sont essentielles pour s'assurer que toutes les personnes concern\u00e9es, de la direction \u00e0 l'\u00e9quipe informatique et aux utilisateurs finaux, comprennent le processus, les d\u00e9lais et les avantages de la migration.<\/p>\n\n\n\n<p><strong>Strat\u00e9gies de gestion du changement organisationnel :<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Participation des principales parties prenantes : <\/strong>Engagez-vous avec les parties prenantes d\u00e8s le d\u00e9but de la phase de planification. Leur contribution peut apporter des informations pr\u00e9cieuses et aider \u00e0 r\u00e9pondre aux pr\u00e9occupations qu'elles pourraient avoir.<\/li>\n\n\n\n<li><strong>Formation et soutien : <\/strong>Fournir une formation et des ressources aux employ\u00e9s pour les aider \u00e0 s'adapter au nouvel environnement. Des canaux d'assistance doivent \u00eatre disponibles pour r\u00e9soudre tout probl\u00e8me survenant apr\u00e8s la migration.<\/li>\n\n\n\n<li><strong>Faire face \u00e0 la r\u00e9sistance :<\/strong> Comprendre les pr\u00e9occupations des personnes r\u00e9fractaires au changement. Un dialogue ouvert peut aider \u00e0 aborder ces questions et \u00e0 obtenir leur soutien.<\/li>\n<\/ul>\n\n\n\n<p>Un plan de communication bien con\u00e7u est essentiel pour tenir toutes les parties inform\u00e9es tout au long du processus de migration. Ce plan doit d\u00e9finir les m\u00e9thodes de communication, la fr\u00e9quence des mises \u00e0 jour et les informations \u00e0 partager \u00e0 chaque \u00e9tape de la migration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Surveillance et optimisation des performances<\/strong><\/h2>\n\n\n\n<p>La surveillance et l'optimisation des performances jouent un r\u00f4le essentiel pendant et apr\u00e8s la migration d'un centre de donn\u00e9es, en garantissant que le nouvel environnement d'exploitation r\u00e9pond ou d\u00e9passe les normes attendues. L'utilisation d'outils et de techniques avanc\u00e9s pour la surveillance permet aux \u00e9quipes de superviser en permanence les performances du syst\u00e8me, d'identifier les goulets d'\u00e9tranglement et d'optimiser l'utilisation des ressources de mani\u00e8re efficace. Ce processus est crucial pour garantir que le mat\u00e9riel physique et les environnements en nuage fonctionnent efficacement.&nbsp;<\/p>\n\n\n\n<p>Les recommandations pour la gestion continue des performances comprennent la mise en place de tableaux de bord complets qui fournissent des informations en temps r\u00e9el sur la sant\u00e9 du syst\u00e8me et l'utilisation d'analyses pr\u00e9dictives pour anticiper les probl\u00e8mes potentiels.&nbsp;<\/p>\n\n\n\n<p>Pour une transition en douceur, il est essentiel d'adapter les efforts d'optimisation aux besoins sp\u00e9cifiques de votre entreprise et de les ajuster en permanence en fonction de l'\u00e9volution de ces besoins. Cette approche dynamique permet de maintenir le succ\u00e8s \u00e0 long terme de l'environnement du centre de donn\u00e9es migr\u00e9, en veillant \u00e0 ce qu'il soutienne efficacement les activit\u00e9s de votre entreprise.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>\u00c9valuation post-migration et am\u00e9lioration continue<\/strong><\/h2>\n\n\n\n<p>Une fois la migration du centre de donn\u00e9es achev\u00e9e, il est essentiel de proc\u00e9der \u00e0 une \u00e9valuation post-migration pour mesurer la r\u00e9ussite du projet. Cette \u00e9valuation doit se concentrer sur diff\u00e9rents param\u00e8tres, notamment les performances, la fiabilit\u00e9 et la rentabilit\u00e9 du nouvel environnement du centre de donn\u00e9es. Ces informations peuvent aider \u00e0 identifier les domaines \u00e0 am\u00e9liorer, <a href=\"https:\/\/exittechnologies.com\/fr\/blog\/centre-de-donnees\/avantages-du-passage-de-linformatique-sur-site-a-linformatique-dematerialisee\/\">s'assurer que la migration vers l'informatique d\u00e9mat\u00e9rialis\u00e9e am\u00e9liore les activit\u00e9s de l'entreprise<\/a>. Sur la base des r\u00e9sultats, il est conseill\u00e9 de mettre en \u0153uvre des initiatives d'am\u00e9lioration continue pour r\u00e9soudre les probl\u00e8mes identifi\u00e9s.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Tendances futures et technologies \u00e9mergentes<\/strong><\/h3>\n\n\n\n<p>Le monde des migrations de centres de donn\u00e9es est en constante \u00e9volution, les tendances futures et les technologies \u00e9mergentes fa\u00e7onnant de nouvelles strat\u00e9gies. Des innovations telles que l'edge computing, la conteneurisation et les architectures cloud hybrides red\u00e9finissent l'approche des migrations de centres de donn\u00e9es.&nbsp;<\/p>\n\n\n\n<p>Il est essentiel de se tenir au courant de ces avanc\u00e9es technologiques pour \u00e9laborer des plans de migration efficaces qui exploitent les nouvelles possibilit\u00e9s. Les entreprises devraient tenir compte de ces tendances lorsqu'elles planifient les futures migrations de leurs centres de donn\u00e9es, afin de s'assurer que leur environnement op\u00e9rationnel et leurs centres de donn\u00e9es restent \u00e0 la pointe de la technologie et capables de soutenir leurs objectifs commerciaux.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Conformit\u00e9 r\u00e9glementaire et s\u00e9curit\u00e9 des donn\u00e9es<\/strong><\/h3>\n\n\n\n<p>Dans le paysage complexe des migrations de centres de donn\u00e9es, la conformit\u00e9 r\u00e9glementaire et la s\u00e9curit\u00e9 des donn\u00e9es apparaissent comme des consid\u00e9rations essentielles. L'adh\u00e9sion aux r\u00e9glementations pertinentes telles que le R\u00e8glement g\u00e9n\u00e9ral sur la protection des donn\u00e9es (RGPD), la loi sur la portabilit\u00e9 et la responsabilit\u00e9 de l'assurance maladie (HIPAA) et la norme de s\u00e9curit\u00e9 des donn\u00e9es de l'industrie des cartes de paiement (PCI DSS) n'est pas seulement une exigence l\u00e9gale, mais un t\u00e9moignage de l'engagement d'une organisation en faveur de la protection des donn\u00e9es et de la vie priv\u00e9e.&nbsp;<\/p>\n\n\n\n<p>Ces r\u00e9glementations ont des implications significatives pour les actifs des centres de donn\u00e9es, en particulier lorsqu'ils impliquent le transfert d'informations sensibles ou personnellement identifiables \u00e0 travers des environnements en nuage ou du mat\u00e9riel physique.<\/p>\n\n\n\n<p>Si vous avez des questions concernant les projets de centres de donn\u00e9es, <a href=\"https:\/\/exittechnologies.com\/fr\/vendre\/serveurs\/\">liquidation du serveur<\/a>ou d'autres projets informatiques, n'h\u00e9sitez pas \u00e0 nous contacter !<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-ready-for-data-center-migration\">Pr\u00eat pour la migration des centres de donn\u00e9es ?<\/h2>\n\n\n\n<p>Laissez exIT Technologies faire le gros du travail pour vous et commencez avec <a href=\"https:\/\/exittechnologies.com\/fr\/services-de-centre-de-donnees\/migration\/\">Services de migration des centres de donn\u00e9es<\/a> aujourd'hui !<\/p>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 14<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span>Data Center Migration Project Plan So, you are looking for tips on data center migration and the steps it takes to effectively migrate from one location to another. You may be asking yourself: \u201chow important is thorough planning, anyways?\u201d What is Data Center Migration? A data center migration is the transfer of certain assets from [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":71898,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"episode_type":"","audio_file":"","podmotor_file_id":"","podmotor_episode_id":"","cover_image":"","cover_image_id":"","duration":"","filesize":"","filesize_raw":"","date_recorded":"","explicit":"","block":"","itunes_episode_number":"","itunes_title":"","itunes_season_number":"","itunes_episode_type":"","footnotes":""},"categories":[43],"tags":[95],"class_list":["post-71897","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-center","tag-data-center-migrations"],"acf":[],"_links":{"self":[{"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/posts\/71897","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/comments?post=71897"}],"version-history":[{"count":0,"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/posts\/71897\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/media\/71898"}],"wp:attachment":[{"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/media?parent=71897"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/categories?post=71897"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exittechnologies.com\/fr\/wp-json\/wp\/v2\/tags?post=71897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}